Page 144 - 1.0/2.3 to SHV RF Connector Datasheets
P. 144

2.4mm Male Connector Clamp Attachment Vertical
     Launch PCB, Removable Microstrip Launch


     RF Connectors
     Technical Data Sheet                                                                                  PE45457


                       Assembly Instruction



                                STEP 1 :
                                        Position vertical launch above substrate.
























                               STEP 2:
                                        Insert screws and tighten connector body against the substrate,
                                        while ensuring center pin is centered on the trace or landing pad.




























                      Click the following link (or enter part number in “SEARCH” on website) to obtain additional part information including
                      price, inventory and certifications: 2.4mm Male Connector Clamp Attachment Vertical Launch PCB, Removable Microstrip
                                                                                                                      -
                      Launch PE45457                                                                     Pasternack does not make
                any representation or warranty regarding the suitability of the part described herein for any particular purpose, and Pasternack does not assume any liability arising out of the use of any part or documentation.




                                                       PE45457  REV 1.0                                                3
   139   140   141   142   143   144   145   146   147   148   149