Page 269 - 1.0/2.3 to SHV RF Connector Datasheets
P. 269

2.92mm Male Connector Clamp Attachment Vertical
     Launch PCB, Removable Microstrip Launch


     RF Connectors
     Technical Data Sheet                                                                                  PE45453


                       Assembly Instruction



                                STEP 1 :
                                        Position vertical launch above substrate.
























                               STEP 2:
                                        Insert screws and tighten connector body against the substrate,
                                        while ensuring center pin is centered on the trace or landing pad.




























                      Click the following link (or enter part number in “SEARCH” on website) to obtain additional part information including price,
                      inventory and certifications: 2.92mm Male Connector Clamp Attachment Vertical Launch PCB, Removable Microstrip   -
                      Launch PE45453                                                                     Pasternack does not make
                any representation or warranty regarding the suitability of the part described herein for any particular purpose, and Pasternack does not assume any liability arising out of the use of any part or documentation.





                                                       PE45453  REV 1.0                                                3
   264   265   266   267   268   269   270   271   272   273   274